Wastewater treatment manufacturers to study how to reduce the wastewater discharge

 

 

 

 

 

 

Wastewater treatment manufacturers to study how to reduce the wastewater discharge

Faced with this problem, the Central Gold-Plated Industry. Group cooperated with scholars and wastewater treatment manufacturers to study how to reduce the wastewater discharge flow to 1/10 of the original. During the process, the Tokyo Metropolitan. Government asked university teachers to assist. But the suggestions put forward considered unrealistic the industry. Often, they could only rely on these operators to constantly explore and read relevant materials before finally finding a way to solve the problem of water consumption and electroplating waste sludge. technology used.

In order to meet regulatory standards wastewater must  piped to a

Common treatment facility, and individual plants Kuwait Phone Number must not discharged arbitrarily. When wastewater from each factory is transported to a wastewater treatment facility. It is stored in a storage tank, and then pumped to a common treatment facility a coordinated team of workers. In this way, the co-processing facility can gradually meet the standard. And after it on the track, there will no “difficulties” the Sewer Bureau. There an advantage that the wastewater of individual manufacturers placed in the storage tank first. And it can efficiently and individually treated according to the nature of the wastewater of different manufacturers.

The collective relocation of electroplating factories beneficial. In terms of economic burden, although individual factories can also do it. Collective relocation can shared and supervised each other. This makes the industrial zones feel connected with each other. Not only because of the above-mentioned Historical factors. But also because of working together to find a way to achieve the goal, the feelings have improved.

See also  Accessibility in communication at events for people with visual and hearing impairments.

It wasn’t until 2002 that the Central Gold Plated Industry Group allowed

Kuwait Phone Number

Every manufacturer to comply with ISO standards. Mr. Masafumi Naito’s understanding of ISO ISO decides that this company will become like this tomorrow. Because ISO a rough target, but in order for the co-processing designers to run smoothly, the central gilding synergy must be defined. Many different sub-goals. With clear goals for each company and disciplined. This allows the co-processing facility to obtain ISO90001 certification.

Generally speaking, he believes that there three main points for achieving this state: grasping the current operating conditions of various manufacturers. Disclosing financial information, and having friendly relations among the manufacturers themselves. It also because of the disclosure of the synergy combination that manufacturers trust each other. After the collective relocation. The production volume or turnover of the manufacturers has increased 20 to 30%. Which can used to repay the relocation expenses. Through the self-developed research and development of the industry, the cost of sewage treatment reduced. And the cost borne the industry also reduced.

Leave a comment

Your email address will not be published.